Overview
Use this page as the installer handover check before tiling, rendering or applying the final finish. Print it or open it on your phone on site.
Final check
| Check | Requirement |
|---|---|
| Substrate | Sound, dry, clean, stable and correctly framed/supported |
| Set-out | Joints planned; edges supported; penetrations located before fixing |
| Cutting | Clean cuts, dry fit completed, exposed edges treated where required |
| Fixing | Corrosion-resistant screws/washers; approx. 200 mm edge / 300 mm field unless the project detail requires otherwise |
| Sealant | Thermasheet MSP Sealant used at nominated joints, corners, penetrations and interfaces |
| Joint reinforcement | Fibreglass mesh/tape and compatible cementitious or waterproofing treatment completed |
| Wet areas | Waterproofing completed to the applicable wet-area design and AS 3740 |
| Curves | Correct Flex/UltraFlex product selected; radius within product limits; support frame follows the curve |
| External | Project-specific support, fixing, edge sealing, reinforced finish, flashings and movement joints confirmed |
| Finish | Tile/render/microcement/coating system approved for the substrate and service conditions |